By Urban Development Department
Sr.No | Do's | Dont's | File |
---|---|---|---|
1 | WHENEVER FILLING DATA FOR BUILDING AND FLOOR DETAILS, ALWAYS MENTION SUB CATEGORY AND ITS VALUE | DATA SHOULD BE ALWAYS FILLED | - |
2 | ALWAYS MARK ROAD WIDING INSIDE PLOT BOUNDARY | DONT MARK ROAD WIDEING OUTSIDE PLOT BOUNDARY | - |
3 | LIFT SHOULD ALWAYS BE MARKED IN SINGLE FLOOR, PERFERABLY ON GROUND OR STILT FLOOR AND ON REST FLOORS MARK LIFTWELL | DONT MARK LIFT ON ALL FLOORS | - |
4 | ALWAYS CHECK WHETHER FSI P-LINE IS IN BLOCK OR NOT | IF FSI P-LINE IS EXPLODED, THEN DONT GENERATED FILE. REMARK FSI P-LINE AND THEN GENERATE IT. | - |
5 | DUCTS, VOIDS, VENTILATION SHAFTS SHOULD BE ALWAYS MARKED INSIDE FSI P-LINE. | DON'T MARK VOIDS, DUCTS, VENTILATION SHAFTS OUTSIDE FSI P-LINE. | - |
6 | WHILE MARKING INTERNAL ROAD IN LAYOUT SERVICE, ALWAYS MENTION WITH PROPER DATA. EG. ROAD WIDTH, NUMBER OF ROAD IN CASE OF MULTIPLE ROADS. | INTERNAL ROAD DATA IN LAYOUT SERVICE SHOULD BE GIVEN PROPERLY | - |
7 | FLOOR HEIGHT NIL MESSAGE POP UP COMES WHEN BUILDING IN PLOT IS NOT THERE. SO KINDLY MARK BUILDING IN PLOT. | WITHOUT BUILDING IN PLOT, FILE WON'T GENERATE. | - |
8 | FOR AMALGAMATION SERVICE, USE MARK LAND TOOL TO MARK MORE THAN 2 PLOTS OR LAND AND ONCE DONE USE MARK AMALGAMATION TOOL. | DON'T USE MARK PLOT FOR LAYOUT BOUNDARY | |
9 | FOR LAYOUT SERVICES, ALWAYS MARK ROAD WIDENING IN MARKED LAND OR PLOT | DON'T MARK ROAD WIDEING OUTSIDE LAND OR PLOT | - |
10 | ALWAYS FILL BUILDING DATA, FLOOR DATA CORRECTLY OTHERWISE THERE IS NO ROW AT POISTION 0 MESSAGE POP UPS. | DON'T LEAVE DATA UNFILLED | - |
11 | MARK SEPERATE EDUCATIONAL/ INSTITUTIONAL FSI IN CASE OF OF EDUCATIONAL/INSTITUTIONAL OCCUPANCY | DON'T MARK COMMERCIAL FSI FOR EDUCATIONAL/ INSTITUTIONAL OCCUPANCY | - |
12 | IN CASE EXPANSION JOINT IS AVAILABLE BETWEEN BUILDINGS, MARK IT IN PLOT | DON'T MARK EXPANSION JOINT IN BUILDING OR FLOOR BOUNDARY | - |
13 | MARK RECREATIONAL FSI LAYER IN RECREATIONAL OPEN SPACE OR RECREATIONAL FLOOR | DON'T MARK IT OUTSIDE | - |
14 | While marking Balcony/Enclosed balcony,it should overlap with carpet and FSI layer. | It should overlap | - |
15 | For more than 4 years Revised Building permission.While doing service data entry of building permission it is mandatory to select plinth/renewal permission. | Without plinth checked don't do service data entry | - |
16 | Mark mezzanine inside room/shop | Don't mark seperate mezzanine floor | - |